Hear from Our Customers
A cracked, faded parking lot tells customers you’re not paying attention. A smooth, well-maintained one says the opposite.
When your parking lot is done right, water drains where it should. Cracks don’t show up in six months. Customers don’t dodge potholes or worry about their tires. You’re not calling someone back out to fix what should’ve been done correctly the first time.
Good asphalt parking lot paving means fewer repairs, less maintenance, and a surface that holds up under Central Florida’s heat and storms. It’s an investment that actually pays off because you’re not redoing it every few years. You get a lot that looks professional, functions properly, and lasts 20 to 30 years when it’s maintained.
Central Florida Blacktop Paving Inc. is based in Winter Garden and serves businesses throughout Dundee and the surrounding Central Florida area. We specialize in commercial parking lot installation and residential driveways, focusing on quality craftsmanship over shortcuts.
Every project starts with clear communication about what’s needed, what it costs, and how long it takes. We use modern equipment and proven techniques to install asphalt surfaces built for Florida’s climate—heat, humidity, afternoon storms, and sandy soil conditions that require proper base preparation.
Dundee’s small-town business environment means your parking lot matters. When customers pull up to your property, that parking lot is their first impression. We understand that and deliver work that reflects well on your business without the runaround or surprise charges.
It starts with a consultation. We come out, look at your property, measure the area, and talk through what you need. You get a clear estimate before any work begins.
Next comes site prep. If there’s old asphalt, it gets removed down to the subgrade. The area is graded so water drains properly—critical in Florida where afternoon storms are routine. Then a compacted sub-base goes in, usually 8 to 12 inches of crushed stone. This is the foundation. Skip it or rush it, and your lot fails early.
Once the base is solid, hot-mix asphalt arrives and gets laid in passes, typically 8 to 20 feet wide. The asphalt is spread evenly, checked for proper slope, then compacted with heavy rollers to create a smooth, dense surface. For most commercial lots, you’re looking at 2 to 4 inches of asphalt depending on expected traffic.
Final steps include curing time, then striping the parking spaces and adding any necessary markings. The whole process for a medium-sized lot usually takes a few days to a week, depending on size and weather. You’ll know the timeline upfront so you can plan around it.
Ready to get started?
Our parking lot paving services in Dundee cover new installations, resurfacing, and repairs. New installation means starting from scratch—grading, base prep, asphalt application, compaction, and striping. Resurfacing adds a fresh layer over an existing lot that’s worn but still structurally sound. It’s more affordable than full replacement and can add 10 to 15 years of life.
In Dundee, proper drainage is non-negotiable. Florida gets heavy rain, and standing water destroys asphalt fast. A quality paving job includes grading that directs water away from the surface and prevents pooling. You also get a sub-base designed to handle the region’s sandy soils, which shift more than other soil types if not properly compacted.
Striping and ADA compliance are part of the package. Your parking spaces need to be clearly marked, and accessible spaces must meet regulations. Some contractors treat this as an add-on. It shouldn’t be—it’s part of doing the job right.
Commercial properties in Dundee benefit from asphalt’s durability and relatively quick installation. Compared to concrete, asphalt costs less upfront, can be driven on sooner, and is easier to repair when maintenance is needed. With regular sealcoating every few years and prompt crack filling, your parking lot stays functional and professional-looking for decades.
Asphalt parking lot paving in Dundee typically costs between $2 and $4.50 per square foot for new installation. That price includes materials, labor, and standard site prep. Resurfacing an existing lot runs $1 to $3 per square foot since you’re not starting from scratch.
Total project cost depends on the size of your lot, current site conditions, and any extras like drainage improvements or ADA-compliant striping. A small commercial lot might run $10,000 to $30,000, while larger properties can reach $75,000 or more. The best way to know what you’re looking at is to get a site visit and a detailed estimate based on your specific property.
Keep in mind that the cheapest bid isn’t always the best value. If a contractor skips the base prep or uses thinner asphalt to cut costs, you’ll pay for it later in repairs. Ask what’s included, how thick the asphalt will be, and what kind of base material they’re using.
A properly installed asphalt parking lot in Florida lasts 20 to 30 years with regular maintenance. Without maintenance, you’re looking at 15 years or less before serious issues show up.
Florida’s climate is tough on asphalt. Heat, UV exposure, humidity, and heavy rain all accelerate wear. That’s why sealcoating every 2 to 5 years is critical—it protects the surface from sun damage and water infiltration. Crack filling should be done yearly to prevent small cracks from turning into potholes.
The quality of the initial installation makes a huge difference. If the sub-base isn’t compacted properly or the drainage is off, your lot deteriorates faster no matter how much you maintain it. Starting with a solid foundation and proper grading gives you the best shot at hitting that 20 to 30 year lifespan.
Resurfacing means adding a new layer of asphalt over your existing parking lot. It’s a good option when the surface is worn—faded, minor cracks, rough texture—but the base underneath is still solid. You’re essentially giving the lot a new top coat. This costs less and takes less time than full replacement.
Replacing a parking lot means tearing out the old asphalt down to the subgrade, fixing any base issues, and installing new asphalt from the ground up. You’d go this route if the lot has major structural problems like deep potholes, widespread cracking, or drainage failures. If the foundation is compromised, resurfacing just covers up problems that will resurface quickly.
We’ll tell you honestly which option makes sense for your property. If your lot only needs resurfacing but someone’s pushing a full replacement, that’s a red flag. If your lot is falling apart and someone’s suggesting a cheap overlay, that’s also a problem. The right call depends on the actual condition of your pavement and base.
For a typical commercial parking lot in Dundee, you’re looking at 3 to 7 days from start to finish. Smaller lots can be done faster, larger or more complex projects take longer.
Site prep and base work usually take a day or two, depending on whether you’re removing old asphalt and how much grading is needed. Asphalt installation itself is relatively quick—often completed in a day once the base is ready. Then you need curing time before striping and before heavy use.
Weather plays a role. Rain delays asphalt work because you can’t lay asphalt on wet surfaces, and Florida’s afternoon storms can push timelines back. We plan around this and will give you a realistic schedule upfront. You can typically drive on new asphalt within 24 to 48 hours, but it’s best to wait a few days before parking anything heavy on it.
Yes, most commercial parking lot projects in Dundee require permits. We handle obtaining the necessary permits as part of the job. This usually includes building permits and possibly site development permits depending on the scope of work.
Before any digging or paving starts, utility lines need to be marked. This is required by law and prevents damage to underground electric, gas, water, or telecommunications lines. The utility company comes out and marks where everything is buried, and we work around those areas.
If your project involves drainage changes, ADA compliance updates, or significant site work, additional permits or inspections may be required. We know local regulations and build permit costs and timelines into our estimate. If someone tells you permits aren’t needed or tries to skip this step, walk away. Unpermitted work can lead to fines, project delays, and headaches down the road.
Sealcoating is the most important maintenance task. It should be done every 2 to 5 years depending on traffic levels and sun exposure. Sealcoating protects the asphalt from UV damage, prevents water infiltration, and keeps the surface looking fresh. It costs around $0.15 to $0.30 per square foot—far less than repairing damage from skipping it.
Crack filling should happen yearly. Small cracks let water seep into the base, which leads to bigger cracks and potholes. Catching them early with crack filler stops the problem before it spreads. This runs about $0.50 to $3 per linear foot depending on crack size.
Keep the lot clean. Sweep away debris, remove oil stains promptly, and make sure drains stay clear. Standing water is asphalt’s enemy, especially in Florida. If you notice water pooling, address drainage issues before they cause structural damage. Every 10 to 15 years, you may need resurfacing to add a fresh layer and extend the lot’s life. With this routine, your parking lot stays functional and professional-looking for decades.